Thursday, November 30, 2006

Changing lamp at the building's exterior

A crew of two was lowered from the edge of the building's roof platform to change the metal halide bulbs. This is a high profile residential tower in Hong Kong that just completed a month ago (Fall 2006) and a bulb change was already required.

1 comment:

Anonymous said...

imhnice one......keep posting